Decontamination Plus exterior with access steps

4 units listed

Decontamination Plus.

Your reprocessing service, supported.
Your workflow, clearly separated.

Catalogue photograph · confirm the exact unit at inspection.
Decontamination Plus interior with reprocessing equipment and work surfaces

Four automated endoscope reprocessors.Equipment for daily reprocessing.

Four Cantel Rapid AER units support medium to high-throughput endoscope reprocessing, alongside a height-adjustable sink for manual pre-cleaning.

Catalogue photograph · confirm the exact unit at inspection.

Clean and dirty zones.Separate spaces for reprocessing.

Physically separate areas have distinct pressure regimes: negative pressure in the dirty area and positive pressure in the clean area. A designated clean gowning area supports staff preparation.

Storage between processing stages.Tracking through the workflow.

The brochure lists one Cantel drying cabinet, one SureStore conditioning system, two TranScope trolleys and an integrated Track and Trace system.

Decontamination Plus exterior showing the extended side section

Expand the working space.Prepare the unit for service.

The brochure lists a disabled access configuration and a deployment time of 1.5 hours with one manager. Confirm site preparation, commissioning and access arrangements for the selected unit.

Catalogue photograph · confirm the exact unit at inspection.
Decontamination Plus exterior in transport configuration

Plan the site services.Prepare for daily operation.

Two 63 A three-phase C-Form connections are required. An onboard reverse-osmosis plant supports water treatment; the generator is for installation and deployment only.

Catalogue photograph · confirm the exact unit at inspection.

The unit in detail.
The connections made clear.

Application
Medium to high-throughput endoscope reprocessing
Reprocessors
4 × Cantel Rapid AER automated endoscope reprocessors
Drying cabinet
1 × Cantel drying cabinet
Storage system
1 × SureStore conditioning system
Transport trolleys
2 × TranScope trolleys
Pre-cleaning
Height-adjustable endoscopy-grade sink
Digital tracking
Integrated Track and Trace system
Zoning
Physically separate clean and dirty areas
Air pressure
Dirty area: negative; clean area: positive
Staff preparation
Designated clean gowning area
Materials
Medical-grade materials, as described in the brochure
Water treatment
Onboard self-contained reverse-osmosis plant
Electrical supply
2 × 63 A three-phase C-Form connections
Generator
Installation and deployment phase only
Deployment
Brochure-listed setup: 1.5 hours with 1 manager; confirm site and commissioning requirements
Accessibility
Full disabled access configuration listed; confirm selected-unit arrangements
Weight
18,000 kg
Maintenance
Gold Service PPM package listed; confirm current coverage
Availability
4 units listed; subject to prior sale

Technical details: June 2026 brochure. Confirm the equipment manifest, service coverage and operating requirements for your selected unit.

4 units listed.
June 2026 brochure listing; confirm current availability.

Compare with Decontamination XL →

Your next reprocessing unit.
Your service, your specification.

Request a quote →